Kitchen remodeling · The Triangle
Kitchens Built Around How You Actually Live
Full gut renovations, cabinet and counter replacements, islands, pantries, and lighting, designed with you, built by our own crews, and run day-to-day by Randy himself. Customers call the process "collaborative, creative and communicative" — their words, from public Google reviews.
What a Beast Mode kitchen includes
- Design collaboration: we work from how your family cooks, stores, and gathers, not from a stock plan.
- Cabinetry: new, refinished, or custom built-ins; islands and peninsulas; hidden pantries. See door styles and finishes in person at Diamond Kitchen and Bath, our showroom in Raleigh.
- Counters and backsplash: quartz, granite, and tile installed by our own crew.
- The trades: dedicated electricians and plumbers for lighting, relocated appliances, and layout changes.
- Flooring and paint: finished by the same team, on the same schedule.
Frequently asked questions
How long does a kitchen remodel take?
A full kitchen remodel typically takes four to eight weeks depending on scope. Because our crews are in-house (demo, electrical, plumbing, cabinetry, paint), the trades run back-to-back with no idle days between subcontractors. You get a written schedule before demo starts.
Can you change the layout, move walls, or add an island?
Yes. Wall removals, relocated appliances, new islands, and pantry rebuilds are core parts of our kitchen work — one customer's review describes replacing a pantry with one that doubled the storage and turning old desk cabinets into a lighted glassware display. Layout changes get scoped in the free estimate so the price reflects them from day one.
Can you refinish or reuse my existing cabinets?
Often, yes — full replacement is not always the right answer. We have repurposed customers' existing uppers into display cabinets and completely refinished existing cabinetry as part of larger remodels. We will tell you honestly in the estimate which route gets the look you want for the least money.
How fast can you start?
We deliver quotes within 24 to 48 hours, and most projects begin within 7 to 10 days of bid acceptance. Material lead times, cabinets especially, set the real calendar, and we lock those dates before demo day so your kitchen is never torn apart waiting on a delivery.
Ready to cook in a kitchen built around you? Call (919) 899-2849 or send the form.
Start here
Tell us about your project
Send the form and we'll get back to you fast, with a quote within 48 hours. Prefer to talk? Call (919) 899-2849, Monday–Friday 8am–8pm.
Browsing first? Meet Randy and Eric or see the gallery.
Loading the quote form…